Unity Square | Phase 2
Phase 2: zoned, serviced, ready
In Komoka's new town centre, beside the Wellness Centre and across the street from shops and the farmers' market. A 0.44 ha (1 acre) municipal civic square at the heart of the project, meeting the zone's public park requirement.
2.21 ha
Site area (5.47 acres), surveyed
342 units
Two-building concept
21,800 sqft
Ground-floor commercial
Phase 2 concept rendering. Building form and tenants illustrative.
At a glance
| Site area | 2.21 ha (5.47 acres), surveyed |
|---|---|
| Frontage | 112.7 metres |
| Depth | 193 metres |
| Zoning | C1-18, Village Commercial Special Provision |
| Zoning status | OPA 65 and Zoning By-law 2024-060 in full force and effect (2024) |
| Servicing | Full municipal water, sanitary and stormwater |
| Stormwater | Core infrastructure including LID infiltration galleries and SWM pond in place for Phase 2 |
| Utilities | Hydro, natural gas and communications on site |
| Roads | Road urbanization and traffic signal contribution funded |
| Parking | Up to 491 spaces, most in an above-grade podium, with no underground excavation. |
Minutes away

Estimated travel times from 85 Tunks Lane. Image not to scale
The concept
Building A
- 8 storeys · 235 residential units (conceptual)
- About 2,025 m² of ground-floor commercial
- Parking integrated in the podium, with a rooftop amenity above
Building B
- 6 storeys · 107 residential units (conceptual)
- Ground-floor units open directly onto the civic square
A 0.44 ha (1 acre) municipal civic square at the heart of the project, meeting the zone's public park requirement. Landscaped open space 37% of the site.
The civic square
A 0.44 ha (1 acre) municipal civic square at the heart of the project, meeting the zone's public park requirement. As part of the original vision, it is a part of the zoning. Ground-floor units and commercial frontages open directly onto the square.
The municipality chose this plan, rezoned the land for it, and approved the amendments with no appeals. Phase 2 is not a parcel awaiting an idea; it is the centre of Komoka's new town centre, with the support to make it a reality.
The team








What a partner receives
A site that Design For Happiness has carried through the hard years: the 2017 competitive RFP win, municipal rezoning, full servicing, stormwater design, and a planning framework now in place, with 69 award-winning rental townhomes rising next door at Phase 1 (under construction).
The selected build partner will have freedom within the approved framework. Rental, condominium or a mix; adult lifestyle or starter apartments. The overall vision must hold, but the product and market strategy is yours.
What remains
Holding symbols lift at site plan: h-2 with a site plan agreement, h-3 with a noise study (grain operation, CN rail and road) accepted by CN and the Municipality. The party that finalizes the building designs completes both, along with an updated traffic study. Phase 1, located closer to the rail line, completed its studies and is under construction; Phase 2 is further away. No further Official Plan or zoning approvals are required.
Who it suits
Phase 2 is suited to builders and investors with mid-rise experience and the capacity to carry a 342-unit, mixed-use project through site plan and construction: institutional developers, established regional builders, and groups with government-backed housing programs.
A detailed information package is available under a mutual NDA. To request it, tell us who you are, a comparable project you have delivered, and the role you would take in Phase 2. We respond to every qualified enquiry.